Stockport · Guide

Kitchen rules and practicalities in Stockport

Most kitchen refits don’t need planning permission, but several rules still apply — some to the work itself, some to the building, and some to the street outside. Knowing which apply to your project helps you ask the right questions and avoid delays.

This is general guidance for homes in England. Requirements change and every house is different, so check the current position with Stockport Council or the relevant body for your project.

Last reviewed 11 Nov 2026.

Gas work

By law, anyone who does gas work must be competent, and anyone doing it as part of their work, as an employee or self-employed, must be on the Gas Safe Register. Fitting, connecting or disconnecting a gas hob or cooker is gas work. HSE guidance gives one narrow exception for cookers: moving a free-standing cooker temporarily on a bayonet-fitted flexible hose, for example to clean behind it, isn’t treated as gas work. Ask to see the engineer’s Gas Safe ID card, check it covers the work you need (such as cookers), and look them up on the Gas Safe Register.

Electrical work and Part P

Electrical work in a home must be safe, and should be designed, installed, inspected and tested to the current wiring regulations (BS 7671). Some of it must also be notified under the Building Regulations (Part P in England) — for example, adding a new circuit for an oven or induction hob, or replacing the consumer unit.

The simplest route is an electrician registered with a competent person scheme, who can self-certify the work. Ask who will provide the electrical installation certificate and the Building Regulations compliance certificate, and keep both — you’ll want them when you sell the house.

Adding sockets or lights to an existing kitchen circuit isn’t usually notifiable, but it should still be tested, and you should get a certificate for it (often a minor works certificate).

Walls, structure and ventilation

Removing or altering a load-bearing wall to open up a kitchen is building work under the Building Regulations, so building control has to be involved before work starts, and you’ll usually need a structural engineer’s calculations for the beam. In a terraced or semi-detached house, work that cuts into a party wall may also mean serving notice on your neighbours under the Party Wall etc. Act 1996, at least two months before work starts. Fixing wall cabinets or shelves to a party wall doesn’t need notice.

Building Regulations guidance (Part F) expects a new kitchen to have extract ventilation. When an existing kitchen is refitted, any extractor fan or ducted cooker hood should be kept or replaced, and the work shouldn’t leave ventilation worse than before; if there was no extract before, a refit doesn’t have to add one. A recirculating hood on its own doesn’t count as extract ventilation, so if the layout or extractor is changing, ask how it will be ducted outside and where the vent will go.

  • Building control can be handled by Stockport Council or by a registered building control approver
  • Apply to building control before the wall comes down, not after
  • Replacing a window or external door is controlled work too (a registered installer can usually self-certify it), and adding or moving one also means altering the wall

Applying to Stockport Building Control

If your kitchen project includes building work that an installer can’t self-certify, such as removing a supporting wall, building control has to be involved before work starts. If you use Stockport Council’s Building Control (external site), there are two routes:

Full plans: you send plans with the application, and they’re checked against the Building Regulations. The council recommends waiting for its decision on the plans before starting. The work is then inspected as it goes, and once it complies you get a completion certificate to keep with your house papers.

Building notice: only for minor domestic work. There are no plans to approve in advance; work can start after a short notice period and is inspected as it goes. The council notes that without approved plans you don’t get the same level of reassurance, so your builder needs to know the regulations well enough to show the inspector the work complies. The council explains the differences between the two routes (external site).

The council’s building control charges (external site) are lower when any notifiable electrical work is done by a Part P registered electrician. If building work was done without approval after 11 November 1985, the council can consider a regularisation application (external site), and parts of the work may need to be opened up so they can be inspected.

As a rough guide to which kitchen jobs involve building control:

  • A refit with new units and fittings doesn’t generally need approval, though drainage or electrical work done as part of it may
  • A kitchen in a room that didn’t have one is likely to need approval, for ventilation, drainage, structural stability, electrical and fire safety
  • Removing or altering a supporting wall needs building control, through the council or a registered building control approver, before work starts
  • For a new circuit, or a replacement window or external door, an installer registered with a competent person scheme can usually self-certify the work

Listed buildings and conservation areas

If your home is a listed building, you may need listed building consent for internal changes as well as external ones — including removing original features such as fireplaces, panelling or old flooring. Carrying out work that needs consent without getting it is a criminal offence, so check before you start: Stockport Council’s heritage map shows listed buildings, and its conservation officer can advise.

Stockport has a number of conservation areas. Internal kitchen work isn’t usually affected, but new external flues, vents or windows can be. In many of Stockport’s conservation areas, Article 4 Directions mean changing windows or doors on a wall facing the road needs planning permission. The council publishes conservation area maps and can tell you whether your address is included.

Older houses

Around two in five Stockport homes were built before the Second World War, and most of the rest before 2000. Kitchens in older houses often bring surprises once the old units come out: walls and floors that are out of level, old wiring or lead pipework, and earlier alterations that weren’t done well. A fitter who has seen the room can allow for this in the quote; kitchen fitting explains what they look for.

Homes built or refurbished before 2000 may contain asbestos. If you suspect it, stop and get it checked before anyone drills, sands or removes it, and tell the fitter about any asbestos you already know of. The Health and Safety Executive publishes guidance for homeowners.

Skips, waste and parking

A skip on any part of the highway, including the road, pavement or verge, needs a licence from Stockport Council, and placing one without it is an offence. The skip owner is responsible for getting the permit and positioning the skip safely. Permits cost more if they’re applied for after the skip is in place, or by a skip company that isn’t registered with the council, so ask the firm to confirm the permit is arranged before delivery. A skip on your own land doesn’t need one, but the pavement or verge in front of your home counts as highway and does. The council’s skip permits page (external site) has the current charges.

If your fitter removes the old kitchen, disposing of it is their responsibility. If you hand waste to someone else, such as a skip firm or collector, check they’re authorised to carry waste: householders have a legal duty of care for their own waste, and if it is fly-tipped and traced back to you, and you didn’t take reasonable steps to check who took it, you can be fined. You can check a carrier on the Environment Agency’s public register, and keep a receipt with their business details. Make sure the quote says who removes the old kitchen: it’s one of the things every quote should spell out.

Stockport Council treats waste produced by tradespeople or builders you’ve hired as business waste. It can’t be taken to the borough’s recycling centres, and the council monitors vehicles there; its advice is to always ask a tradesperson to include waste disposal in their quote (external site). If you strip out the old kitchen yourself, the three household waste recycling centres (external site) (Adswood Road, Bredbury Parkway, and Rose Hill in Marple) take waste from your own home, including from DIY projects, free of charge; the council lists wood and timber, rubble and electrical items among what they accept. The council points to the Recycle for Greater Manchester website for more information, so check it before you go. Building waste can’t go in a standard bulky-item collection; the council runs a separate, chargeable collection for DIY and building waste (external site).

If you live on a street with permit parking, check the council’s current permit rules (Stockport has discontinued visitor scratch cards) and plan where the fitter’s van and deliveries will go before the work starts.

Flats and leasehold homes

If you own a flat on a lease, check the lease before planning a new kitchen. Your lease may require the freeholder’s or managing agent’s consent for alterations, especially anything involving structure, plumbing or ventilation, and some set rules about working hours and noise.

Questions people ask

Do I need planning permission for a new kitchen?

Not usually for a like-for-like or internal refit. Planning permission can be needed if the work changes the outside of the building, such as a new window, door or flue on a prominent wall, especially in a conservation area. Listed buildings are different: internal changes can need listed building consent.

Who tells building control about the work?

For notifiable electrical work, a registered electrician notifies it through their competent person scheme. For structural work, you or your builder apply to building control before work starts, and when it’s finished you should get a completion certificate to keep with your house papers. Ask at the quote stage who will handle it.

Sources

Official guidance this page relies on. Rules and fees change, so check the source before you act.